  • How can I provide feedback?
    The project team previously hosted a public open house on Thursday, Sept. 21, and invite you to review the proposed design prior to construction in 2025. To learn more about the design, click here. To sign up for email updates to stay in the loop on the next steps here. To provide feedback to the project team, call us at 844-567-8839 or email us at info@1300eastslc.com.
  • What are the project limits?
    The project limits include 1300 East between 2100 South and Elgin Avenue. You can view the project map here.
  • When will the project be built?
    Construction is scheduled to begin in 2025. To view the schedule, click here.
  • Has 1300 East been studied before?
    The 1300 East project is building on a foundation of several transportation planning and analysis efforts. This area was evaluated as part of the Local Link Study, which reached its conclusion in early 2022. The environmental study incorporated the recommendations from the Local Link circulation study, which included development of bicyclist and pedestrian improvements. It also evaluated potential new intersection layouts for 1300 East and Highland drive and surrounding traffic signals. Given the scope and funding available for the project, no transit recommendations will be included in this study, but the selected design will incorporate the future needs of the corridor as much as possible.
bottom of page